At Engineered Vision, we’ve learned that the difference between a successful automation project and a budget-draining failure usually comes down to what happens in the first few weeks, long before any metal gets cut.

The $4,000 We Give Away on Every Project

We start every potential project by essentially giving customers around $4,000 worth of engineering time – for free.

That sounds crazy until you see what happens when you skip thorough front-end work. Missing critical process details before kickoff leads to budget overruns, timeline delays, unhappy customers, and damaged reputations. If you don’t spend significant time developing scope and running feasibility on the front end, you’ll more than likely spend 3x more fixing issues that proper planning would have caught.

Our approach to scope development includes:

Dedicated site visits with our engineering team. We don’t send a salesperson to take notes. Our actual engineers walk your floor, observe your process, and ask questions that only come from experience building machines.

Talking with operations and maintenance folks. The tribal knowledge that lives on the plant floor – the quirks of existing equipment, the workarounds operators have developed, the parts that always jam on second shift – rarely makes it into formal specifications. We make it our business to capture this information by speaking directly with the people who run the equipment every day.

Understanding part variation. What happens when you get flash on molded parts? What if your vendor changes slightly? What about out-of-spec parts that slip through incoming inspection? These edge cases often determine whether an automation system succeeds or fails.

Creating project-specific scope documents. Beyond standard manufacturing spec sheets, we document exactly what success looks like and get sign-off from both teams on deliverables.

I can’t count how many times we’ve shown up to a plant only to find operators performing a task that wasn’t included in scope, incompatible power supplies, insufficient air pressure, unexpected washdown requirements, or software that doesn’t play nice with the client’s ERP. Each surprise means delays, extra costs, and headaches for everyone.

A good spec doc tells us what resources are available, what constraints we’re working with, and how new equipment needs to integrate with existing systems. It opens up opportunities to optimize and future-proof in ways the client might not have considered.

 

Finding Where Projects Could Fail – Before They Do

We always ask our engineers to tell us where they think a project could fail: “What are you most unsure about with this design?”

Then we ask: “Should we test it?”

Each process has a combination of old challenges (problems Engineered Vision has solved before) and new challenges (problems no one that we know of has solved). We look at the new challenges and decide which have low enough risk to move forward with and which need more testing. Risk is typically determined by a combination of cycle time requirements, physics involved, cost, and constraints that a specific design choice would cause (limiting the ability for a later change if it doesn’t work).

Once we’ve established the high-risk items, we set up a plan to prototype that item or have a backup option if the first approach doesn’t work. A backup option might be as simple as extra tapped holes in a tabletop for a jack screw – small accommodations that cost almost nothing during initial fabrication but could save weeks if a design iteration becomes necessary.

A Real Example: Inspecting the “Invisible”

We had a medical device project where the customer needed us to identify translucent parts – essentially teaching a computer to see something that’s almost invisible. This is one of the trickier challenges in machine vision integration, and it’s an area where we’ve developed particular expertise.

Our robot and vision vendor initially struggled with the application. Rather than guessing at solutions, we worked directly with their technical team to crack the physics of it. We tried different lighting configurations, tested backlit versus front-lit approaches, experimented with polarization. We documented what worked and what didn’t.

The result was a machine vision system that reliably identified translucent bodies at 30 parts per minute. That inspection challenge, if we’d left it untested until the full machine was assembled, could have derailed the entire project. By prototyping it early and working through the physics, we solved it before it became expensive to fix.


Drive to the Physics, Always

When something isn’t working right, a lot of people default to the guess-and-check method. I absolutely hate guess and check for problem solving – especially on a custom machine.

If you drive into the physics of the problem, you can generally solve it. That might mean getting the oscilloscope out (which we do on rare occasions), or simply using a voltmeter and tracing everything down. It means really knowing why things are going wrong before trying to fix them.

We had a situation where parts weren’t assembling correctly. Several engineers had ideas on how to fix it, and each proposed solution would have taken days to machine and implement. I stopped the team and said: we need to know beyond a shadow of a doubt that we understand exactly why this is failing, because there are probably three or four factors contributing to the issue.

Fixing a problem based on a perceived issue – rather than a verified one – is always expensive. Guess-and-check feels faster in the moment, but it rarely is. The surer path to the right solution on the first try is collecting real data and understanding what’s actually happening.


Why Documentation Matters More Than You Think

Seven years in business has taught me that effective communication is the backbone of all successful projects. During any project, it’s critical that EVERYONE is on the same page about the risk items and our plans to mitigate risk and solve the problem.

Here’s how we approach documentation and communication:

Set clear expectations upfront. What exactly constitutes success? What are the acceptance criteria? What happens if we hit unforeseen challenges? These conversations happen before any work begins.

Regular updates and progress reports. We don’t disappear for months and resurface with a finished machine. Customers stay informed throughout the build process.

Listen actively and address concerns immediately. If something feels wrong to you, it probably warrants investigation. The earlier we catch issues, the cheaper they are to resolve.

Document literally everything. Meeting notes, phone conversation summaries, pertinent emails – these are all references you’ll wish you had at some point in the process. We create project-specific documentation beyond standard specs because the details matter.

In the medical and pharmaceutical manufacturing space, documentation isn’t optional – if it’s not documented, it didn’t happen. We provide IQ/OQ documents with our medical device machines because our customers need them for validation. This documentation helps them get machines qualified and running faster, sometimes cutting weeks off the deployment timeline.


The Build Phase: Where Experience Counts

Building custom automation equipment for the $100,000 to $1,500,000 price range sits in a challenging sweet spot. Small shops with a few jack-of-all-trades engineers typically lack the capacity and sophistication for this level of complexity. Large, sophisticated integrators often won’t touch projects under a million dollars.

We’ve gotten good in this space because it’s challenging to be profitable here. If you think something’s going to work a certain way and it doesn’t, you’ve lost your profit. The margin for error is small.

This is where our team’s average of 25 years of experience makes a real difference. Our automation team has seen countless variations of the problems that crop up during custom machine builds. They know which vendors and vendor solutions to implement for specific applications and what we’ll need to custom fabricate. Having a wide spectrum of technologies and solution providers to choose from – rather than being locked into one manufacturer’s ecosystem – means we can pick the best hardware, software, and support combination for each unique project.

Case Study: Medical Device Assembly

A medical device manufacturer came to us facing slow production rates, constant tooling changes eating up time, struggles with translucent parts, tangling issues slowing everything down, tight tolerances, and GMP compliance requirements keeping them up at night.

Our solution:

Speed: 30 parts per minute. One cap every two seconds.

Adaptability: Handles 20+ different parts without manual tooling changes through robot guidance via machine vision.

Precision: Both encoder and machine vision feedback for servo control.

Compliance: IQ/OQ documentation included.

Physics problem solved: Translucent part identification that initially stumped our vendors.

Quality assurance: Both torque and assembly distance checks – because in medical devices, “close enough” isn’t acceptable.

The tech stack included an Epson SCARA Robot, machine vision cameras, precision motion control, Allen Bradley PLC, and a Weintek HMI. The machine runs day and night, keeping their production numbers on target.

 

Testing and Acceptance: Verifying Before Shipping

Factory acceptance tests (FATs) have evolved. We now offer virtual FATs that go beyond basic Zoom calls.

Our virtual tests cut travel costs for customers and allow them to invite more interested parties. This lets engineers catch small details they might have missed during a rushed in-person visit.

Testing protocols focus on verifying that we’ve delivered what was specified:

Cycle time verification. Does the machine hit the required parts-per-minute consistently, not just occasionally?

Part variation testing. Run samples from different production lots, different vendors, parts at the edges of tolerance.

Edge case handling. What happens when something goes wrong? Does the machine fail gracefully? Can operators recover without an engineering call?

Integration confirmation. Does it communicate properly with existing systems – PLCs, ERPs, vision systems?


After the Machine Ships: Measuring Real Results

This is the step a lot of integrators skip over. Not us. We’re in it for the long haul, so we make sure our customers get the ROI we promised them.

After ensuring that a project is wrapped up, we stay in touch with the client. What did we find out? Did the machine deliver the productivity improvements we projected? Were there unexpected benefits? Any issues that need attention?

At Engineered Vision, we regularly deliver projects with a less than 2-year ROI. The biggest ROI factor that most don’t take into account? Maintenance costs. Just because they aren’t included in the installed equipment cost doesn’t mean they aren’t part of the equation.

Equipment maintenance is essential unless you want decreased performance and increased downtime. When you’re calculating ROI for your next automation project, work with your integrator to get a realistic estimation on maintenance costs. Stop guessing.


What Makes a Project Succeed: The Short Version

If I had to distill our approach to custom machine design into a few principles:

Fall in love with the problem, not the solution. Deeply understand issues before seeking solutions. The more time you spend understanding exactly what you’re solving, the less time you spend fixing things that don’t work.

Prototype the risky parts early. Identify what could fail and test it before you’ve built an entire machine around an unproven assumption.

Work with real data. Don’t guess and check. And if you feel there’s a small chance something won’t work, assume it won’t until proven otherwise with actual measurements.

Document everything. You can’t take too many notes. Meeting notes, phone conversation summaries, pertinent emails – these are all references you’ll wish you had at some point.

Communicate early and often. If you suspect someone on the team doesn’t have the big picture, take the time to transfer that understanding.

98.6% of manufacturing businesses in the USA are classified as “small.” These companies don’t typically have the capital budgets that Fortune 100 manufacturers do. Margin for error when installing automated systems is small, and risk mitigation is critical.

That’s exactly the kind of project where Engineered Vision shines.


Ready to Talk About Your Project?

If you’re facing a unique manufacturing challenge – slow production rates, quality control issues, compliance requirements, or labor constraints – we’d like to understand your situation.

We offer free consultation for your production issues. An experienced engineer can normally be on site within 2-3 business days. We build custom machines to solve custom needs with no minimum order quantity. A typical machine for us ranges from $100,000 to $1,500,000.

Contact Us for a Discovery Call

Or explore our related resources:


Engineered Vision was founded in 2017 by engineers who identified an opportunity to help US manufacturers compete in a global marketplace. In 2020, the company acquired Union Enterprises machine shop, giving us a fabrication operation with over 75 years of experience. Today, we operate as a vertically integrated supplier of custom machines for medical, pharmaceutical, life sciences, transportation, and consumer products industries.